Home › Construction › Demolition RAMS
Demolition RAMS — Risk Assessment & Method Statement Generated Instantly for £29
A demolition RAMS combines your risk assessment and method statement in one document. Describe the demolition job, site conditions and machinery used — we generate a fully written, CDM 2015-compliant demolition RAMS covering structural collapse, asbestos, utilities, exclusion zones and all relevant legislation in minutes.
Used by demolition contractors, principal contractors and CDM coordinators across the UK

🏗️ Working near occupied buildings or on contaminated sites? Mention it — we'll include vibration monitoring, dust suppression, hoarding requirements, asbestos management and all controls required under CDM 2015 and BS 6187.
Legal requirements for demolition contractors
The Construction (Design and Management) Regulations 2015 (CDM 2015) place specific duties on demolition contractors. Regulation 12 requires that demolition or dismantling be planned and carried out in such a manner as to prevent danger. Regulation 22 requires a written risk assessment and method statement before work starts — this is your RAMS document.
BS 6187:2011 (Code of practice for full and partial demolition) is the industry standard. While not legislation, compliance with BS 6187 demonstrates that you have met your duty under CDM 2015. It covers structural surveys, method of demolition, exclusion zones, services disconnection, asbestos management and protection of the public.
The Control of Asbestos Regulations 2012 require a suitable and sufficient asbestos survey before demolition begins (Regulation 5). If asbestos is present, it must be removed by a licensed contractor before demolition unless it is non-licensed asbestos that can be managed during the work. Your RAMS must reference the asbestos survey and removal plan.
The Health and Safety at Work Act 1974 requires all employers and self-employed contractors to assess risks and put controls in place. For demolition, this means a written assessment covering structural collapse, falling debris, dust, noise, vibration, manual handling of materials, operation of plant and machinery, and protection of the public. Failure to provide a suitable RAMS is a breach of your legal duties and will result in the principal contractor refusing access to site.
How it works

1. Describe the demolition job
Tell us the type of demolition (soft strip, partial, full structural), building type, height, proximity to other buildings, plant and machinery used, and any specific hazards such as asbestos, contaminated ground or live services. If you need both risk assessment and method statement in one document, we combine them automatically.

2. Let the app take the strain
Anyrisks produces a fully written, UK-compliant demolition RAMS referencing CDM 2015, BS 6187, the Control of Asbestos Regulations and all relevant health and safety legislation. The document includes your method of work, sequence of operations and all required controls.

3. Instant download and use
Download as PDF and Word. Submit it to your principal contractor, include it in your pre-construction information pack, or hand it to the CDM coordinator. £29, no subscription.
What it covers
Every demolition RAMS is written in full — covering all structural, environmental and operational hazards relevant to your job.
Structural collapse and instability during demolition
Exclusion zones and collapse buffers (BS 6187 guidance)
Falling debris and protection of the public
Demolition plant operation — excavators, breakers, crushers
Asbestos survey requirements and licensed removal
Utilities disconnection — gas, water, electricity, telecoms
Use of CAT and Genny for underground services location
Dust suppression and air quality monitoring
Noise and vibration control — neighbouring buildings
Hoarding, barriers and pedestrian protection
Manual handling of rubble, beams and heavy materials
Working at height during soft strip and dismantling
CDM 2015 compliance and principal contractor duties
BS 6187:2011 code of practice alignment
Works for
From soft strip to full structural demolition, Anyrisks covers every type of demolition job and site condition.
What customers say
"Every principal contractor wants a RAMS before we step on site. Anyrisks gave me a full risk assessment and method statement in one document — covered exclusion zones, plant operation and asbestos removal. Accepted first time."
Craig T.
Demolition contractor, Manchester
"We do a lot of soft strip ahead of refurb projects. The RAMS covered manual handling, dust suppression and services disconnection — everything the CDM coordinator asked for. Saved me hours."
Lee H.
Strip-out specialist, London
"We were demolishing a three-storey building next to occupied flats. Anyrisks included vibration monitoring, hoarding and public protection — exactly what the council and principal contractor needed to see."
Karen D.
Demolition project manager, West Midlands
Anyrisks vs DIY templates
| Anyrisks | DIY / Templates | |
|---|---|---|
| Written in full — not a blank form | ✓ | ✗ |
| CDM 2015 and BS 6187 referenced | ✓ | ✗ |
| Risk assessment and method statement combined | ✓ | ✗ |
| Asbestos and utilities disconnection included | ✓ | ✗ |
| Exclusion zones and collapse buffers calculated | ✓ | ✗ |
| Plant operation and competence requirements | ✓ | ✗ |
| Public protection and hoarding measures | ✓ | ✗ |
| Ready in under 2 minutes | ✓ | ✗ |
| Instant PDF and Word download | ✓ | Sometimes |
Frequently asked questions
Does this meet CDM 2015 requirements for demolition contractors?
Yes — demolition RAMS are written to align with the Construction (Design and Management) Regulations 2015, referencing the principal contractor's duties and the specific controls required under BS 6187. The assessment covers structural stability, asbestos, utilities isolation and exclusion zones as standard.
Can I use it for soft strip as well as full structural demolition?
Yes — describe whether you're doing soft strip, partial demolition or full structural demolition and the assessment will be tailored. Soft strip RAMS focus on manual handling, dust and services disconnection, while structural demolition includes collapse zones, plant operation and falling debris.
Does it cover asbestos and pre-demolition surveys?
The RAMS will reference the requirement for a pre-demolition asbestos survey under Regulation 5 of the Control of Asbestos Regulations 2012, but the survey itself must be arranged separately. If asbestos is present, mention it and we will include removal and licensed contractor requirements.
Is machinery and plant operation included?
Yes — if you're using excavators, breakers, crushers or any other plant, describe it and the RAMS will include operator competence, exclusion zones, visibility and safe operation controls specific to demolition machinery.
What about neighbouring properties and public protection?
Mention proximity to occupied buildings, footpaths or roads and the RAMS will include hoarding, debris netting, exclusion zones, vibration monitoring and dust suppression measures to protect the public and neighbouring occupiers.
Can I add this to a tender submission or principal contractor RAMS pack?
Yes — demolition RAMS are delivered as PDF and editable Word document in the standard format expected by principal contractors, planning supervisors and CDM coordinators. The document is ready to submit as part of your pre-construction information pack.
Does it cover utilities disconnection and services isolation?
Yes — the RAMS will include requirements for contacting utility companies, obtaining service drawings, use of CAT and Genny locators, and safe isolation of gas, water, electricity and telecoms before demolition begins.
How quickly can I get it?
Under 2 minutes. Describe the demolition job, site conditions and any specific hazards and Anyrisks produces a complete, CDM-compliant demolition RAMS instantly.
Also see: The ultimate guide to risk assessment · Do I need a risk assessment? · Risk assessment legal requirements · Risk assessment generator