Trusted by 300+ UK businesses
HSE 5-Step Compliant
Checks weather forecasts, nearest A&E & more

Home › Risk Assessments › Crane Operation Risk Assessment

Crane Operator / Mobile Crane Lifting Risk Assessment — Generated Instantly for £29

Describe the crane type, lift category and site conditions — we generate a fully written, UK-compliant lifting operations risk assessment covering LOLER 1998, lifting plans and exclusion zones in minutes.

Built for crane operators, lifting contractors, appointed persons and principal contractors managing lifting operations

crane operation lifting risk assessment illustration

🏗️ Lifting near overhead lines, other cranes or occupied buildings? Mention it — we will include exclusion zone sizing, signalling procedures and the specific controls required under LOLER 1998 and CDM 2015.

Legal requirements for crane and lifting operations

The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) require that every lifting operation involving lifting equipment is properly planned by a competent person, appropriately supervised, and carried out in a safe manner (Regulation 8). Lifting equipment must also undergo thorough examination at statutory intervals under Regulation 9 — typically every 6 months for equipment used to lift people, or 12 months for other lifting equipment.

The Provision and Use of Work Equipment Regulations 1998 (PUWER) apply alongside LOLER, requiring that cranes and lifting accessories are suitable for use, properly maintained, and only operated by trained and competent persons. Under the Health and Safety at Work etc. Act 1974, employers and the appointed person must ensure a documented risk assessment is in place covering ground conditions, load weight, exclusion zones and communication failures.

On construction sites, the Construction (Design and Management) Regulations 2015 (CDM 2015) require the principal contractor to ensure lifting operations are coordinated with other site activities and that a lifting plan is available before work begins. Industry guidance BS 7121 sets out best practice for the safe use of cranes, including the roles of the appointed person, crane supervisor and slinger/signaller.

How It Works

Step 1 - describe the crane and lifting operation

1. Describe the lift

Tell us the crane type (mobile, tower, crawler), load weight, ground conditions, lift radius and any nearby hazards such as overhead lines or occupied structures. If a slinger/signaller is involved, mention it and their role will be included.

Step 2 - AI generates your crane lifting risk assessment

2. Let the app take the strain

Anyrisks produces a fully written, UK-compliant lifting operations risk assessment referencing LOLER 1998, PUWER 1998 and CDM 2015 where relevant.

Step 3 - download your crane lifting risk assessment

3. Instant download and use

Download as PDF and Word. Attach it to your lifting plan, hand it to the principal contractor, or file it for your thorough examination records. £29, no subscription.

What it covers

Every crane and lifting operations risk assessment is written in full — covering all hazards relevant to the lift.

✓

Ground conditions and outrigger/ground-bearing pressure

✓

Load weight, centre of gravity and rated capacity checks

✓

Lifting plan requirements under LOLER 1998 Regulation 8

✓

Thorough examination and certification records (LOLER Regulation 9)

✓

Exclusion zones and public/pedestrian protection

✓

Proximity to overhead power lines and other structures

✓

Slinger/signaller communication and banksman procedures

✓

Appointed person and crane supervisor responsibilities

✓

Weather limits — wind speed and visibility restrictions

✓

Multiple-lift and tandem-lift coordination risks

✓

Crane erection, dismantling and travel on site

✓

Dropped load and struck-by risk controls

✓

Lifting accessories — chains, slings and shackles inspection

✓

Emergency procedures and rescue planning

Works for

From mobile crane hire to tower crane erection, Anyrisks covers every type of lifting operation.

Mobile crane hireTower crane erectionCrawler crane liftingSteel frame erectionPrecast concrete liftingPlant and machinery liftsHIAB/lorry loader operationsTandem liftingCrane dismantlingPiling rig support liftsRoofing material liftsGlazing panel liftsModular/offsite unit liftingScaffold material hoisting

Anyrisks vs DIY templates

AnyrisksDIY / Templates
Written in full — not a blank form✓✗
LOLER 1998 lifting plan requirements referenced✓✗
PUWER 1998 and CDM 2015 aligned✓✗
Ground conditions and outrigger loading covered✓✗
Exclusion zones and overhead line proximity included✓✗
Appointed person and slinger/signaller roles addressed✓✗
Ready in under 2 minutes✓✗
Instant PDF and Word download✓Sometimes

Frequently asked questions

Does this cover LOLER 1998 and lifting plan requirements?

Yes — crane and lifting operations risk assessments reference the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), including the requirement for a lifting plan under Regulation 8 and thorough examination records under Regulation 9.

Does it cover mobile cranes, tower cranes and crawler cranes?

Yes — describe the crane type, lift category and site conditions and the assessment will be tailored. Mobile crane outrigger and ground-bearing risks differ significantly from tower crane erection risks, and this is reflected in the content.

Is ground conditions and outrigger loading covered?

Yes — ground-bearing pressure, outrigger pad sizing and proximity to excavations or services are included where relevant, alongside the duty to assess ground conditions under LOLER and the Construction (Design and Management) Regulations 2015 (CDM 2015).

Does it cover appointed person and banksman duties?

Yes — mention whether an appointed person, crane supervisor or slinger/signaller is involved and their responsibilities under BS 7121 will be included alongside communication and signalling controls.

Is it suitable for presenting to principal contractors and site managers?

Yes — Anyrisks produces a fully written, regulation-referenced risk assessment in the format expected by principal contractors, construction site managers and HSE inspectors under CDM 2015.

Does it cover exclusion zones and working near overhead lines?

Yes — mention proximity to overhead power lines, other structures or public areas and exclusion zone requirements, goalpost barriers and permit-to-work controls will be included.

Can it cover multiple lifts or a sequence of lifts in one job?

Yes — describe the lift sequence, loads and configuration changes and the assessment will address the risks across the full operation, including re-planning requirements where conditions change.

How long does it take to generate?

Under 2 minutes. Describe the crane type, lift and site, and Anyrisks produces a complete, regulation-referenced crane operation risk assessment instantly.

Also see: The Ultimate Guide to Risk Assessment · Do I Need a Risk Assessment · Risk Assessment Legal Requirements · AI Risk Assessment Generator

Give Anyrisks a go today.

You'll be delighted with your Risk Assessment, or your money back.