Home › Risk Assessments › EV Charger Installation Risk Assessment
EV Charger Installation Risk Assessment — Generated Instantly for £29
Describe the EV charger installation job — domestic or commercial, supply type, mounting location. We generate a fully written, UK-compliant risk assessment covering isolation, earthing, supply capacity and all relevant electrical regulations in minutes.
Built for electricians, EV charger installers and electrical contractors working on domestic and commercial sites

⚡ Connecting to a PME supply or working near an existing consumer unit? Mention it — we'll include earthing and open-PEN fault protection, isolation procedures, and the specific controls required under the Electricity at Work Regulations 1989.
Legal requirements for EV charger installation
The Electricity at Work Regulations 1989 place a legal duty on employers and self-employed installers to prevent danger from electrical work. Regulation 4 requires that electrical systems are maintained to prevent danger, and this applies directly to new circuits added for EV charging — from the supply connection to the charge point itself.
The Health and Safety at Work Act 1974 requires a risk assessment for all work carried out, including EV charger installation. This means documenting the risks of electric shock, fault conditions from PME earthing arrangements, fire from poor connections, and manual handling of equipment and cable, along with the controls in place to manage each one.
Technical installation should follow BS 7671 (IET Wiring Regulations, 18th Edition), particularly Section 722, alongside the IET Code of Practice for Electric Vehicle Charging Equipment Installation. Many installations also require notification to the local Distribution Network Operator (DNO) due to the additional load placed on the supply. Anyrisks assessments reflect these requirements and reference the relevant regulations throughout.
How It Works

1. Describe the job
Tell us the property type, supply arrangement (PME or TT), mounting location, and whether cable routing involves working at height or through existing structures. Mention lone working if applicable and we'll include the relevant controls.

2. Let the app take the strain
Anyrisks produces a fully written, UK-compliant risk assessment referencing the Electricity at Work Regulations 1989 and BS 7671 Section 722 where relevant.

3. Instant download and use
Download as PDF and Word. Hand it to your client, pass it to the principal contractor, or file it for compliance purposes. £29, no subscription.
What It Covers
Every EV charger installation risk assessment is written in full — covering all electrical and site hazards specific to the job.
Electric shock risk — live and dead working procedures
Isolation, lock-off and tag-out procedures
PME earthing and open-PEN fault protection
Supply capacity and DNO notification requirements
Overcurrent and short-circuit protection on new circuits
Working at height (external wall mounting, loft cable runs)
Manual handling of charge points, cable and tooling
Drilling and penetration risks (gas, water, existing cabling)
Weather and outdoor working conditions for external installs
COSHH — sealants, solvents and drilling dust
Lone working on domestic and commercial sites
Fire risk from poor connections or overloaded circuits
BS 7671 (18th Edition) Section 722 alignment
Electricity at Work Regulations 1989 compliance
Works For
From domestic wallboxes to commercial charging hubs, Anyrisks covers every type of EV charging installation work.
Anyrisks vs DIY templates
| Anyrisks | DIY / Templates | |
|---|---|---|
| Written in full — not a blank form | ✓ | ✗ |
| Electricity at Work Regulations 1989 referenced | ✓ | ✗ |
| BS 7671 Section 722 and EV Code of Practice aligned | ✓ | ✗ |
| PME earthing and DNO notification considered | ✓ | ✗ |
| Isolation and lock-off procedures included | ✓ | ✗ |
| Covers both domestic and commercial jobs | ✓ | ✗ |
| Ready in under 2 minutes | ✓ | ✗ |
| Instant PDF and Word download | ✓ | Sometimes |
Frequently asked questions
Also see: The Ultimate Guide to Risk Assessment · Do I Need a Risk Assessment · Risk Assessment Legal Requirements · AI Risk Assessment Generator
Does this cover both domestic and commercial EV charger installations?
Yes — describe the property type and whether it's a domestic wallbox, workplace charging bank, or commercial/fleet installation, and the assessment will be tailored to the specific electrical and site risks involved.
Does it reference the Electricity at Work Regulations 1989?
Yes — EV charger installation work involves connecting new circuits to the existing electrical supply, so the assessment references the Electricity at Work Regulations 1989, including isolation procedures and safe working on or near live conductors.
Does it cover DNO notification and supply capacity checks?
Yes — mention whether the installation requires Distribution Network Operator (DNO) notification or approval due to load on the local supply, and the assessment will include this as a control measure alongside the electrical risks.
Is working at height covered, for example drilling through walls or accessing consumer units?
Yes — if the job involves external wall mounting, cable routing through lofts, or working from a ladder or steps, describe this and height-related controls will be included alongside the core electrical risks.
Does it cover earthing arrangements such as PME and open-PEN fault protection?
Yes — EV charger installations require specific earthing considerations, particularly where PME (Protective Multiple Earthing) supplies are present. Mention your earthing arrangement and the assessment will reflect the relevant protective device requirements.
Is BS 7671 and the IET Code of Practice for EV charging referenced?
Yes — assessments align with BS 7671 (18th Edition) Section 722 and the IET Code of Practice for Electric Vehicle Charging Equipment Installation, which set the technical standard for safe installation.
Can it be used as part of a RAMS pack for a principal contractor?
Yes — the assessment is produced in the standard written format expected by principal contractors, facilities managers and the HSE, and can be included directly in your RAMS pack.
How long does it take to generate?
Under 2 minutes. Describe the EV charger installation job and Anyrisks produces a complete, regulation-referenced risk assessment instantly as PDF and Word.